How Long Does It Take to Complete Your Dream Reinforced Concrete Villa?
  • April 17, 2025

If you're planning to build a villa and wondering, "How long will it take?" — you're in the right place. In this guide, we explain the step-by-step construction timeline for reinforced concrete villas and provide realistic delivery durations based on real-world experience.


What is a Reinforced Concrete Villa, and Why Choose One?

Reinforced concrete (RC) villas are one of the most popular housing types in Turkey, known for their durability, long lifespan, and flexibility in design.

Key advantages include:

  • High resistance to fire, moisture, and harsh weather conditions

  • Minimal maintenance over the years

  • Full architectural freedom with personalized interior layouts

But the question remains:

How long does it take to build one from start to finish?


Average Construction Timeline: 6 to 10 Months

While this range may vary depending on project details, the typical turnkey delivery time for a concrete villa is between 6 and 10 months.

Let’s break it down:


1. Design & Permits (1–2 Months)

  • Soil analysis and site survey

  • Architectural, structural, mechanical and electrical project design

  • Submission and approval of building permit applications

Tip: Working with an experienced firm can shorten approval times.


2. Foundation & Structural Work (2–3 Months)

  • Excavation and ground leveling

  • Pouring the foundation slab (raft or strip foundation)

  • Building vertical structural elements (columns, beams, slabs)

  • Completion of rough structure and roofing


3. Exterior Works (1–2 Months)

  • Exterior wall construction

  • Roof cladding and waterproofing

  • Thermal insulation and façade finishing


4. Interior Finishes (1–2 Months)

  • Electrical and plumbing installations

  • Interior plaster, paint, tile and flooring works

  • Installation of doors, windows, cabinetry and built-ins


5. Landscaping & Final Handover (1 Month)

  • Landscaping, walkways, terrace and driveway finishing

  • Final quality checks and occupancy permit application

  • Turnkey delivery with all systems tested and operational


Factors That May Affect the Timeline

  • Land conditions and soil class

  • Villa size and number of floors

  • Local climate and seasonal weather

  • Municipality approval speed

  • Construction team's coordination and supply chain


 Concrete vs. Steel Villa: A Quick Timeline Comparison

CriteriaReinforced Concrete         VillaSteel Construction Villa
Average Delivery Time                6–10 Months3–5 Months
On-Site Waiting TimeHigh (curing required)Low (prefabricated assembly)
Weather DependencyHighMinimal

With expert planning and full project management, even concrete villas can be delivered in under 8 months.


Why Choose Efil İnşaat?

At Efil İnşaat, we deliver more than just buildings — we deliver confidence, precision, and quality.

Our turnkey villa solutions include:

  • End-to-end project planning

  • In-house architectural and engineering services

  • Transparent timelines and contracts

  • On-time delivery backed by field experience


How Soon Can Your Villa Be Delivered?

Every project is unique. Share your plot location, area, and design preferences — and we’ll prepare a custom delivery estimate and cost proposal for your dream villa.